[JFT125] Inheriting Operating Points Between Modes in Efficiency Map Studies

Sign in to download the data
Please enter your username and password to sign in.


Sign In

* A JMAG Software User (paid user) account is required.
*It is different from the service for JMAG WEB MEMBER (free membership). Please be careful.
About authentication ID for JMAG website List of JMAG Website Services by Membership Type

Overview

In JMAG, by using efficiency map studies (speed priority mode) in system design stages, and efficiency map studies (accuracy priority mode) in component design stages, efficiency maps can be created corresponding to the required accuracy of each phase. It is during these times that operating point information can be seamlessly transferred between modes.
This document describes the method for using operating point information obtained with speed priority mode in accuracy priority mode.

Keywords

Efficiency map, Speed priority mode, Accuracy priority mode, Operating point

Search Filter
  • All Categories

An engineer's diary
JMAG-Express Online